Survey content...
The typical elements in the client report
The nuts and bolts
of a survey..
A site or property survey make require anything from 2 hours to an entire 8 hour day depending on the size of the site, the client requirements and the amount of time taken during the pre and post-survey consultations.
​
-
Typical survey time: 3 hours
-
Typical consultation time: 1 hour
-
Reports preparation: 2 hours
​
A range of tools and software are utilised by the surveyor in compiling a professional, clear and accurate report for a client. These include:
​
-
Spectrum analysis software
-
Industry mast area databases
-
Spectrum analyzers and meters
-
Google mapping API's
-
Excel spreadsheet data
The survey is complete, the client receives by post:
A printed analysis report with summaries and recommendations that will also include:
​
-
Site plans showing signal strengths / vectors
-
Google area satellite maps showing coverages
-
Terrain maps showing vectors to all masts / pylons
-
Property plans of electric / magnetic field strengths
-
Excel sheet of actual readings in various formats
-
Safety level information sheets
-
Report on recommended shielding solutions
​
The sensitivity levels and frequency detail in the reports may be defined by the client.
*Note - highly sensitive measurements and detailed frequency mapping may require additional time.